The paperwork between a finished installation and a working credit on your bill.
Net metering lets you export surplus generation to the grid and receive credit against what you draw later. On-site load is served first; only the excess is exported. It is what makes a solar system worth sizing properly rather than conservatively.
Getting there means a DISCOM application, a sanctioned-load check, an agreement, a bidirectional meter, an inspection and a synchronisation approval. Each utility runs this differently. We handle the process rather than handing you a form.

Exported units are credited and adjusted against later consumption.
We prepare, submit and follow up the DISCOM application on your behalf.
We are present for the inspection and address anything raised.
BESCOM and other DISCOMs in the states where we deliver projects.
Net metering is permitted up to limits tied to your sanctioned load and local rules. We confirm what your connection supports before designing.
Forms, drawings, equipment datasheets and ownership documents compiled and submitted.
The utility reviews and issues approval, sometimes with conditions we resolve.
Net metering agreement executed and the bidirectional meter installed.
Final inspection, clearance, and grid synchronisation — at which point export credit begins.
Something not covered here? See all FAQs or ask us directly.
Share a recent electricity bill and we will come back with a system size, an expected generation figure and an itemised quote — no obligation.